Power Meter Installation Strategy Procedure
Objective:
- Install power meters to understand energy usage patterns and identify potential energy savings opportunities.
- Prioritize metering of main utility feeds and major energy-consuming equipment/systems.
Scope:
- This applies to all company facilities.
Responsibilities:
- Energy officer on Site: Oversee the installation of power meters.
- Qualified Electricians/Contractors: Perform the actual installation of power meters.
Procedure:
Identify Priority Areas:
- Identify main utility feeds and major energy-consuming equipment/systems for metering.
Select Appropriate Meters:
- Determine the appropriate type and size of power meter for each location, considering voltage level, current rating, and type of load.
Obtain Necessary Approvals:
- Secure approval for power meter installation from relevant authorities, if required.
Engage Qualified Personnel:
- Ensure qualified electricians or contractors install the power meters per applicable codes and standards.
Calibrate and Commission:
- Calibrate and commission the power meters post-installation to ensure proper and accurate functioning.
Record and Document:
- Record each power meter's location, type, and specifications in a central database or system. Ensure this information is easily accessible and regularly updated.
Analyze Data:
- Use data from power meters to understand energy usage patterns, identify potential energy savings opportunities, and make data-driven decisions to improve energy efficiency.
Regular Maintenance:
- Regular maintenance and power meter checks are conducted to ensure proper and accurate functioning.
Retire or Replace:
- Retire or replace power meters that are no longer functional or accurate.
Review and Update:
- Periodically review and update this procedure to ensure it remains relevant and effective.
0 komentar:
Posting Komentar